Projects with an emphasis on resolving undesirable or inefficient conditions within electrical distribution systems:

Lawson Mardon Thermaplate - Design Build contract to provide (3) 800 KVAR / eight step and (1) 600 KVAR / six step 480 volt, automatically switched, 5th harmonically tuned capacitor banks for power factor correction / harmonic attenuation.

Planters Cotton Oil Mill - Design Build contract for an automatically switched, 4350 KVAR, three step, 13.8 KV capacitor bank in parallel with the service entrance utility bus.

Little Rock McClellan Veterans Administration Hospital – Design Build contract to provide (2) automatically switched, three step, 13.8 KV, 5th harmonically filtered capacitor banks sized 1350 KVAR and 1050 KVAR respectively in parallel with (2) service entrance switchgear busses.

Firestone Building Products - Design Build contract to provide an automatically switched, three step, 13.8 KV, 5th harmonically filtered 9600 KVAR capacitor bank in parallel with overhead service entrance utility distribution bus.

Tyson Foods - Design Build contract to provide (2) automatically switched, three step, 13.8 KV, Capacitor banks sized 3600 KVAR and 1800 KVAR respectively in parallel with (2) overhead service entrance utility distribution busses.

Conway Regional Health Systems - Design Build contract to provide (1) 150 KVAR / six step 480 volt, automatically switched, 5th harmonically tuned capacitor bank for power factor correction / harmonic attenuation.

 

 